What We Model
BIM sub-services for Oregon teams
Nine BIM disciplines, each scoped to the LOD, software, and code review your project phase actually needs.
- A
We build architectural BIM models in Revit that carry design intent from schematic massing through construction documentation, including walls, floors, roofs, doors, windows, and finish schedules tied to a live parametric model. For Oregon projects this means the model updates automatically as design-review comments, energy-code compliance checks, or accessibility requirements change a plan, keeping drawing sets and schedules synchronized instead of manually re-drafted. Deliverables include sheet sets, area schedules, and a coordinated model file ready to federate with structural and MEP disciplines for clash review before permit submittal.
- S
Our structural BIM models capture framing, foundations, connections, and lateral systems built to Oregon Structural Specialty Code seismic design category requirements and Cascade-region snow-load values. We model in Revit and Tekla Structures depending on delivery format, producing framing plans, connection details, and quantity schedules that stay linked to the analytical model. Every structural model is reviewed for buildability before it's issued, catching beam-column conflicts, foundation clearance issues, and rebar congestion early enough that the fabrication shop never has to field-verify a correction.
- M
We model mechanical, electrical, and plumbing systems - ductwork, piping, conduit runs, and fire protection - as fully routed, spatially coordinated Revit systems rather than schematic layouts. Each discipline is checked against ceiling heights, structural framing, and architectural finishes before the model is federated, so HVAC runs, sprinkler mains, and electrical trunk lines are resolved on screen. This is the discipline most Oregon general contractors request first, because MEP clashes are the single largest source of RFIs on multi-story and healthcare projects once trades hit the field.
- R
Platform-specific Revit modeling for firms standardized on Autodesk's ecosystem, covering custom family creation, template development, worksharing setup, and model audits for teams inheriting an existing project. We build parametric families matched to manufacturer specifications, configure shared parameters for schedule reporting, and clean up model health issues - duplicate elements, unused families, warning overload - that slow down large Oregon project teams working across multiple linked models and disciplines simultaneously.
- C
We federate architectural, structural, and MEP models in Navisworks or Solibri and run structured clash-detection passes covering both hard clashes (physical overlap) and soft clashes (clearance and access violations). Each pass produces a tracked clash report with viewpoints, severity ranking, and assigned responsibility, reviewed live with your team on a coordination call. For Oregon's multi-trade commercial and healthcare projects, this workflow typically resolves the majority of field conflicts before a single duct or beam is fabricated.
- P
For renovation, retrofit, and historic-building work common in Portland and Salem's older cores, we convert laser scan and point cloud data into accurate as-built Revit models. Registered point clouds are modeled to the tolerance your project needs, capturing existing structure, MEP routing, and finish conditions that legacy drawings no longer reflect. This gives design teams a verified baseline for renovation planning instead of relying on decades-old as-builts that rarely match current field conditions.
- 4
We link the coordinated model to construction schedules and cost data, producing 4D sequencing simulations that visualize phasing and 5D quantity takeoffs that support estimating and procurement. General contractors use these deliverables to sequence Oregon site logistics, phase work around weather windows, and generate model-based bills of quantities that track more accurately than manual takeoffs, particularly on projects with staged occupancy or complex site-access constraints.
- V
BIM Execution Planning (VDC) Oregon
Before modeling starts, we help define the BIM Execution Plan - LOD targets by phase, model ownership, file-naming conventions, coordination cadence, and clash-resolution protocol - aligned with your project's virtual design and construction workflow. A clear execution plan prevents the most common cause of BIM delivery friction on Oregon multi-firm teams: mismatched LOD expectations between architect, engineer, and contractor models that surface only after coordination has already started.
- F
BIM Facility & Asset Management (6D/7D) Oregon
For owners and facility managers, we deliver as-built models enriched with asset data - equipment schedules, warranty information, maintenance intervals - structured for handoff into a CMMS or facility-management platform. This turns the construction-phase model into a usable operations tool instead of an archived file, letting Oregon facility teams query equipment locations and specifications directly from the model years after substantial completion.